N&O Index Card Listings

Displaying 1-3 of 3 results.
Bridges - Oregon Inlet
  • Erosion taking toll on bridge - Ap 24 92, 6B
Bridges - Oregon Inlet
  • Emergency federal aid is denied - Ja 9 91 4B
  • Dredge master (CLIETT) faces Coast Guard charges (for Bonner Bridge damage) - Fe 1 91 4B
  • Bridge to open this afternoon; Repairs to continue on link to Hatteras - Fe 12 91 4B
  • Bonner bridge is back; Link opens to relief of Outer Banks folks - Fe 13 91 1B
  • Study explores options for Hatteras Island link - Fe 15 91 4B
  • Tar Heel editors speak: - What to do about Bonner Bridge? - Fe 24 91 7J
  • DOT plans new span across Oregon Inlet - Ap 24 91 1B
  • Tar Heel editors speak: - Surprise: Project protects bridge - Jy 28 91 7J
Bridges - Oregon Inlet
  • $18 million, easy travel lost with sunken spans - Oc 27 90 1
  • Collapse, winds isolate Ocracoke; Fishermen, campers wait for ferries as islander take things in stride - Oc 27 90 14A
  • Dredge cuts BRIDGE link to Hatteras - Oc 27 90 1
  • How breakaway dredge disabled bridge - Oc 27 90 1
  • Weather, destruction could lengthen costly Bonner Bridge repairs - Oc 27 90 14A
  • Stranded motorists face lengthy waits for ferries - Oc 28 90 1
  • Islanders pondering life without their bridge - Oc 29 90 5A
  • Travelers line up for ferries; Unexpected waits anger weary families - Oc 29 90 1
  • Getting home getting easier on islands - Oc 30 90 1B
  • Main, electricity and beer begin to flow again on Hatteras Island - Oc 31 90 23A
  • Limited ferry service begins at Oregon Inlet - No 1 90 3B
  • Electricity returns to islands today No 2 90 11A
  • Way cleared for Oregon Inlet jetties (also bridge repair) No 2 90 1
  • Islander Samaritans bridge gap No 4 90 1E
  • Power restored to two islands No 4 90 5C
  • Martin asks emergency declaration for bridge No 6 90 4B
  • Ferries operating across Oregon Inlet No 8 90 5B
  • New ferries could revive Hatteras; Business owners say tourism is down No 9 90 4B
  • Businesses get assistance after bridge collapse trounced trade No 10 90 4B
  • Weather holds sway over Bonner bridge repair work No 17 90 1B
  • Dredge captain (Cliett) says ferocity of storm a surprise No 27 90 4B
  • Report faults captain in bridge's fall; State plans to seek cost of repairs - De 19 90 1
  • Bridge repair bill soars; Outer Banks span may reopen in Feb. - De 27 90 1B
  • State files suit for $5.5 million in bridge fall - De 29 90 1B