N&O Index Card Listings

Displaying 431-437 of 437 results.
Roads
  • Benson-Wilmington link paving contracts awarded - Ja 15 83 1C
  • Funds promised to repair N. C. 12 - Ja 20 83 2C - Jack Ass Road residents get kick out of tag - Fe 7 83 1C
  • State to widen Outer Banks' main highway (N. C. 12) - Fe 12 83 2C
  • 3,200 miles in N. C. open to twin trailers - Ap 7 83 14C
  • Contract awarded to move road at RDU - Ap 9 83 14C
  • Jones proposes bill for N. C. 12 repair - Ap 21 83 23A
  • N. C. alters roposal to ease traffic woes near mall, Beltline - My 12 83 5C
  • Completion of I-40 to Wilmington remains top priority, Hunt asserts - My 25 83 3C
  • New homes hinder highway plans - Jn 6 83 1C
  • Funding for UNC System, roads puts Senate, House panels at odds - Jn 25 83 1C
  • U. S. ties tollbooths to aid for N. C. 12 - Jy 19 83 1
  • Proposal seeks to name Beltline to honor Raleigh men for roles - Au 3 83 1
  • Editorial: Name of the highway game - Au 5 83 4A
  • Sign naming Beltline goes up too early - Au 12 83 1
  • Beltline now a tribute to Bradshaw, Benson - Au 13 83 1C
Roads
  • Coastal roads threatened by beach reach; $100 million needed to save pavement, study finds - Mr 27 92, 1
  • Highways threatened by coastal erosion (Map) - Mr 27 92, 6A
  • Other states' experiments could help Tar Heels - Mr 29 92, 4G
  • Speed limit is still 55 mph on highway dedicated to Petty - Ap 15 92, 4B
  • Safety of trees near roads questioned - Ap 17 92, 1B
  • Highway projects, politics linked - My 21 92, 4B
  • Report says rules bent for donors' pet roads - My 28 92, 4B
  • Standoff threatens road funds (DOT and Durham and Orange counties) - Jn 27 92, 2B
  • Editorial: Slow that dozer down - Jy 3 92, 12A
  • Federal funds to speed up N.C. roads, rail projects - Jy 10 92, 4B
  • Wake and Durham projects fare well in highway plan - Jy 10 92, 4B
  • N.C. closer to grants for transit; Federal bill targets roadwork and buses - Jy 13 92, 6B
  • Funds for rail crossing upgrades sent off track by road projects - Au 9 92, 1
  • Major highway projects in Triangle accelerated - Au 15 92, 4B
  • Proposed freeway to Norfolk seems like a mirage to many - Au 15 92, 4B
  • Wishes for roads at odds; Some leaders push for people-friendly plans - Au 27 92, 1
  • N.C. highways among best, study finds - Au 28 92, 4B
  • Parkway fanciers aghast over plans to pave dirt roads - Oc 8 92, 5B
  • Wider loads receive boost; DOT panel OKs 16-foot trailers - No 6 92, 1
  • State backs wider 64, 17; Raleigh-Norfolk link is planned - De 30 92, 1B
Roads
  • Developers offer to fund RTP roads - Mr 14 84 1C
  • Swain crowd debates two wilderness bills - Mr 17 84 4C
  • Record road improvements planned - Mr 26 84 1
  • Jumble of issues mires wilderness bills (Swain Co.) - Mr 28 84 1
  • New highway (I-277) to be costliest in state - My 13 84 27A
  • Construction cost for road projects dips 15% in state - My 27 84 51A
  • Panel reroutes plan to reaffirm state power over roads - Jn 14 84 26A
  • Highway (U.S. 64-264) gets greening for 400th - Jy 7 84 1C
  • State studies widening N.C. 86 between Chapel Hill, Hillsborough - Se 13 84 2C
  • Board Oks plan to widen Atlantic Beach intersection - Se 15 84 2C
  • State to speed building of freeway by diverting $16.7 million in funds - Oc 4 84 2C
  • State to channel funds to freeway (Wilmington-to-Benson) - Oc 5 84 2D
  • Officials tour private road to weigh takeover (Corolla to Dare Co.) - Oc 6 84 4C
  • Proposed state road (to Corolla) worries conservancy - Oc 10 84 6C
  • Editorial: Risky road to Corolla - Oc 12 84 4A
  • State to take over road, allow access to Corolla - Oc 13 84 3C
  • Sand, water block Outer Banks roads (from Hurricane Josephine) - Oc 15 84 4C
  • Right to close private road is questioned (Hillsborough) - Oc 16 84 1C
  • Landowners complain of right-of-way plan (Duck-to-Corolla road) - Oc 31 84 3C
  • Coastal road (to Corolla) opens as gatehouse falls - No 3 84 2C
  • State board favors four-lane road that would connect Cary, RTP, I-40 - De 6 84 1C
  • I-40 link scheduled for 1991; 35 new projects on 10-year plan - De 15 84 1
Roads
  • I-40
  • I-85
  • I-277
Roads
  • State's public works wearing out as repairs delayed - Au 8 82 1
Roads
  • $26.3 million approved for state road projects - Ja 9 88 1C
  • I-40 Garner bypass opens to mixed reviews - Ja 21 88 1
  • I-40-U.S. 70 link will open this afternoon - Ja 20 88 16C
  • Motorists get that sinking feeling as potholes mar streets - Ja 20 88 1C
  • Under the Dome: Harrington waxes poetic over roads (history of program) - Fe 1 88 1
  • $22.4 million OK'd for road contracts - Fe 13 88 2C
  • Officials push paving for state's dirt roads - Fe 16 88 18C
  • Editorial: Fancy prices for new roads - Mr 12 88 10A
  • Panel (Highway Study Commission) told cities require billions to improve roads - Mr 31 88 1C
  • I-40 widening likely to worsen traffic problem - Ma 4 88 1C
  • Billions sought for 'era of highways' - Ma 11 88 18C
  • Building contracts approved; Transportation board awards $33 million - Ma 14 88 1C
  • Roads' face-lift may bring on ugly snarls (U.S. 15-501) - Ma 19 88 2C
  • More asphalt needed on road to tourism riches - Ma 22 88 3I
  • Wilmington residents might soon be driving lane renamed for Jordan - Ma 29 88 33A
  • State is lagging by billions in improving its highways - Jy 3 88 10A
  • Roads chief says federal cuts threaten Beltline, other projects - Jy 8 88 1
  • Under the Dome: Panel to urge halt in naming roads - Jy 8 88 1
  • N.C. road namers do what NBA can't: keep Jordan out of the lane - Jy 9 88 1C
  • Under the Dome: Martin hopes to see Michael Jordan road - Jy 13 88 1
  • Editorial: A dead end for Road Jordan - Jy 14 88 14A
  • Under the Dome: Basnight plugs for roads - Jy 24 88 5A
  • I-40 work might get early start - Au 9 88 2C
  • Contracts to widen, pave I-40 awarded - Au 13 88 11A
  • Transportation chief calls for new paving priorities - Au 19 88 24A
  • I-40 opening delayed at link near Chapel Hill - Au 24 88 2C
  • Jordan vows top priority for U.S. 17 - Au 31 88 3C
  • Transportation officials prepare for I-40 traffic tie-ups - Se 8 88 3T
  • All-day I-40 rush hour calls for a little night work - Se 15 88 1T
  • Under the Dome: Officials invited for I-40 inspection - Se 16 88 1
  • Under the Dome: GOP road plans shift political lanes - Se 18 88 1
  • Highway projects on which engineering work will be sped up, according to Gov. James G. Martin
  • (Chart) - Se 23 88 22C
  • I-40 traffic snarl entangling other N.C. roads - Se 27 88 1C
  • State will spend record $505 million on highway construction, rights of way - Oc 14 88 2C
  • Transportation panel names roads, bridges - No 20 88 37A
  • Editorial: A coalition for highways - No 23 88 22A
  • Plan allots $3 billion for highways - De 9 88 26A
  • N.C. highway officials trying to sort out wishes from needs - De 30 88 1
Roads
  • Highway plan features more-is-better thinking - Mr 31 89 14A
  • Rock slide closes 20 miles of I-40 - Ap 7 89 2C
  • Tar Heel editors speak: - Covering up North Carolina with pavement: It's a shame - Jn 4 89 7D
  • Most lanes fast on I-95's trail through N.C. - Jy 2 89 1
  • New law will boost road work - Au 1 89 3D
  • Highway funds requested for passenger train; I-40 expected to be completed next summer - Se 1 89 1C
  • Under the Dome: - Late Claude Pope will be honored - Oc 14 89 1
  • Federal and N.C. (environmental) regulations compared - No 3 89 4A
  • Road plan will skirt federal law; N.C. plans to make environmental rules - No 3 89 1
  • Under the Dome: - What's in a name? Highway politics - No 3 89 1
  • Editorial: - Roads don't need names - No 10 89 20A
  • Harrington calls story incorrect; Environmental studies pledged on road work - De 1 89 6B
  • Editorial: - Higher gas tax, fewer costs - De 3 89 6J
  • Campaign gifts by landowners linked to roads (POLLARD) - De 4 89 1
  • Cracks turn to gaping holes on I-85 - De 15 89 1
  • DOT should finish I-85 repairs today - De 16 89 5B
  • Stretch of I-40 near Benson opens today - De 22 89 1
  • Temporary pothold relief for I-85 on its way this week, officials say - De 26 89 1B